岗位描述(节选)
1. Materials order and return arrangement.
2. Make sure the materials status same as SAP confirmation.
3. Control F18A all materials pending status & OSO overdue rate.
4. Support Engineer stock reduction A3 project.
5. FAR/CQN/DOA parts return to WH in 2 WKs.
6. 100% on-time tooling calibration/certification
7. Double confirm Emergency order UND and reason of EMO accuracy for cost reduction.
8. Ne……
完整岗位描述与官方投递入口,请登录后在岗位详情页查看。